Construction Project Completion Notice


The main construction project and the accompanying environmental protection facilities of Dongguan Shenghong Precision Mold Co., Ltd. have been completed. 2021 Year 11 Month 10 Completed today, it is now publicly announced in accordance with the Ministry of Environmental Protection's "Provisional Measures for Environmental Protection Acceptance upon Completion of Construction Projects."

 

Construction Unit: Dongguan Shenghong Precision Mold Co., Ltd.

Public notice date:  2021 Year 11 Month 10 Day

 

Basic Information on Engineering Construction

(1) Construction Site, Scale, and Main Construction Contents

The unit's construction project is located in Guangdong Province. Dongguan City Chang'an Town Shatou South District, Heshun Road On the 18th (North Latitude 22 ° 4640.510 ″, 113° East 4458.980 ") Construction. Project land area 3156 Square meters, floor area 5156 Square meters Annual Processing Output Produce TF-SD adapter card: 31.64 million units.

(II) Construction Process and Environmental Approval Status

In July 2021, Dongguan Shenghong Precision Mold Co., Ltd. commissioned Guangdong Yufeng Biotechnology Co., Ltd. to prepare the "Environmental Impact Assessment Report Form for the Construction Project of Dongguan Shenghong Precision Mold Co., Ltd." The project's EIA report was approved by the Dongguan Municipal Bureau of Ecology and Environment on September 26, 2021, with approval document number: Dong Huan Jian. [ 2021 Number 6235.

(III) Investment Situation

The total project investment is 100 Ten thousand yuan, including environmental protection investments 100,000 yuan, accounting for 10% of the total investment %

  • Construction Status of Environmental Protection Facilities

1 Wastewater from daily life is treated in a three-stage septic tank before being discharged into the municipal sewage interception network, which then directs it to the town's wastewater treatment plant for further processing.

2. Injection molding, assembly (welding), laser engraving, sealing The process is set up in a closed workshop, and the generated exhaust gases are collected and then routed to "The secondary activated carbon adsorption unit" discharges treated exhaust gases into the atmosphere; waste gases generated from the soldering process are collected and then released into the air at height; emissions from grinding and laser marking processes occur in an uncontrolled manner; and kitchen fumes, after being processed by an oil-fume purification system, are discharged into the atmosphere at height.

3. Noise-reduction and soundproofing measures have been implemented in the production workshop and on the production equipment.